Add a new idea
Filter by status
Needs review
129
Future consideration
514
Already exists
72
Will not implement
68
Planned
×
Shipped
150
Filter by category
Meridian Cloud
×
126
Meridian Mobile
×
48
Meridian Portal
×
112
Meridian Server
×
626
Log in / Sign up
Log in
Identify yourself with your email address
Email address
Recent
Trending
Popular
1
Vote
Separate rendition task from export package job
Creating renditions is a part of an Export Package (to Portal) job.This is very error sensitive and source of failing package sends.This results in failed export jobs from which it is hard to recover.It also does not seem possible to do a good che...
Created 05 Aug 12:47 by Hans van Koelen
Meridian Server
5
Future consideration
1
Vote
Be able to render a DWG to PDF within Portal (after upload)
Review in Portal depends on the PDF files uploaded by the contractor.There is no way to determine if the PDF is an actual representation of de DWG.When the PDF is rendered in Portal we are sure that this is up-to-date and represents the actual sta...
Created 05 Aug 12:24 by Hans van Koelen
Meridian Portal
0
Already exists
1
Vote
Make sure that when an export package has a failed status no (ghost) documents are present in Portal.
When an export packages fails it seems to be possible that some (or all documents) are already in the portal, preventing the package from being resend.
Created 05 Aug 12:07 by Hans van Koelen
Meridian Portal
1
Will not implement
1
Vote
As a projectowner I want to be able to withdraw a send document/package in any state
When wrong/not actual/superseded documents are being send to a contractor it should be able to withdraw them at any time and in any state. So even when the packages is already accepted by the contractor.
Created 05 Aug 11:57 by Hans van Koelen
Meridian Portal
1
Already exists
1
Vote
Add a flow for unchanged documents
For a contractor it must be possible to return (submit) a document with a status "Unchanged". When this document returns to Meridian it should be revoked from the workflow. It's now hard to determine wat has been changed and what is not changed.
Created 05 Aug 11:18 by Hans van Koelen
Meridian Portal
1
Already exists
1
Vote
Be able to disable the release step
A portal owner is able to release a portal document. A release document is in fact locked in portal, only way out is "Change released document" (that must be clicked a few times to be functional). When the Portal is only being used for transferrin...
Created 05 Aug 09:42 by Hans van Koelen
Meridian Portal
0
Future consideration
1
Vote
Be able to give the Portal a corporate identity
We like to be able to give the portal a corporate identity.Apply a company specific look and feel, logo, housestyle to Landing page and/or Header/footer on all other pages.
Created 05 Aug 09:18 by Hans van Koelen
Meridian Portal
1
Will not implement
1
Vote
Use Projectnumber instead of Projectname for naming of download zip-files
The projectname is a description of a project that does not has to be unique.The unique identifier for the project is the projectnumber. Use this (with timestamp) when creating zip files.
Created 05 Aug 08:45 by Hans van Koelen
Meridian Portal
2
Will not implement
1
Vote
Use "Send" functions based on selection
We always have to use the clipboard. We like to see this optional, so be able to send documents based on a selection (to contractor, Meridian or for Review)
Created 05 Aug 07:40 by Hans van Koelen
Meridian Portal
1
Will not implement
1
Vote
Indicate "project copy exists" + indication "All project copies in status Unchanged" on Property page
If we copy documents/drawings from Master to Project folders we copy with references. The reference files will typically not put in "under change" within the project folders. Nevertheless the indication "project copy exists" is indicated on the Pr...
Created 04 Aug 13:51 by Guest
Meridian Cloud
2
Will not implement
« First
‹ Prev
…
80
81
82
83
84
85
86
87
88
…
Next ›
Last »